The following districts presented on the progress of their proposed projects at the May 13, 2026 Massachusetts School Building Authority (the “MSBA”) Facilities Assessment Subcommittee (the “FAS”) Meeting:
District: Manchester-Essex Regional School District
School: Essex Elementary School
Phase: Feasibility Study
Owner’s Project Manager: Dore & Whittier Management Partners, Inc.
Designer: JCJ Architecture, PC
The Manchester-Essex Regional School District (the “District”), the Owner’s Project Manager, and design team presented an overview of the options studied during the Feasibility Study and the District’s preferred solution to proceed into Schematic Design to replace the existing Essex Elementary School with a new facility serving grades PreK-5 on the existing site. The FAS, MSBA staff, and the District discussed the following: appreciation for the Educational Program and the updates made since the original submission; distribution of special education spaces and the DESE review process following Schematic Design; integration of other subject areas with English/Language Arts and balancing programs to improve student engagement; appreciation for the outdoor spaces, their intended use and proposed activities; accessibility considerations for outdoor spaces and opportunities for community use, summer school programming and recreation; maintenance considerations associated with the proposed greenhouse; community outreach and support for the project among non-school affiliated voters; construction phasing considerations, including the choice of construction delivery method; further development of the site plan, specifically relating to site access and circulation at the car drop-off loop; further development of the landscape plan, specifically relating to hardscape versus greenspace and landscaping near the wetlands/walking path; massing of the academic wing; character of the entrance to the PreK classrooms; and current maintenance operations and the importance of including maintenance/facilities staff in planning for the proposed building.
District: Town of Chelmsford
School: Colonel Moses Parker Middle School
Phase: Feasibility Study
Owner’s Project Manager: LeftField, LLC
Designer: Ai3 Architects, LLC
The Town of Chelmsford (the “District”), the Owner’s Project Manager, and design team presented an overview of the options studied during the Feasibility Study and the District’s preferred solution to proceed into Schematic Design to replace the existing Colonel Moses Parker Middle School with a new facility serving grades four through six on the existing site. The FAS, MSBA staff, and the District discussed the following: appreciation of the Educational Program and the updates made since the original submission; distribution of special education spaces and the DESE review process following Schematic Design; the importance of continued attention to user needs as the design progresses; the location of the art classrooms on the second floor relative to the stage and considerations associated with transporting materials for stage productions; the proposed TV Studio and opportunities to collaborate with or seek resources from local cable networks; the location of the proposed Student Art Gallery and opportunities to showcase student work in a central location while enhancing navigation and interior circulation; appreciation for the clarity of the floor plans, building layout and design elements that break down scale; the layout of the classroom neighborhoods and flexibility to organize grade levels by floor or by wing; clarification of the vestibule design and anticipated further development; appreciation of the central location of the Media Center and opportunities to further refine the upper loft areas; future determination of the construction delivery method and proposed location of geothermal wells; and, current maintenance operations and the importance of continued involvement from maintenance and facilities staff as the design moves forward.