The following districts presented on the progress of their proposed projects at the September 16, 2026 Massachusetts School Building Authority (the “MSBA”) Facilities Assessment Subcommittee (the “FAS”) Meeting:
District: Dighton-Rehoboth Regional School District
School: Dighton Elementary School
Phase: Feasibility Study
Owner’s Project Manager: Skanska USA Building, Inc.
Designer: Arrowstreet, Inc.
The Dighton-Rehoboth Regional School District (the “District”), the Owner’s Project Manager, and design team presented an overview of the options studied during the Feasibility Study and the District’s preferred solution to proceed into Schematic Design to replace the existing Dighton Elementary School on the site between the existing Dighton Elementary School and the Dighton Middle School. The FAS, MSBA staff, and the District discussed the following:
- Appreciation of the District’s Educational Program and the updates made since the original submission;
- The importance of continued input from faculty and staff who contributed to the Educational Program as the design progresses;
- Appreciation for the thoughtful use of the existing greenhouse for program delivery and considerations for its potential relocation as part of the proposed project;
- The distribution of Special Education spaces and the DESE review process during Schematic Design;
- The location of the main entrance and visual connection to the central green;
- Clarification of the proposed site circulation and consideration for opportunities to optimize the experience for parents, students and visitors and the location/approach to the entry plaza and main entrance;
- Site constraints, access and circulation, and associated considerations during phased construction; and,
- The importance of geotechnical investigations and suggestion to thoroughly examine the existing infrastructure on site to ensure coordination with geothermal well installation.
District: City of New Bedford
School: Charles S. Ashley Elementary School
Phase: Feasibility Study
Owner’s Project Manager: P-Three, Inc.
Designer: Turowski2 Architecture, Inc.
The City of New Bedford (the “District”), the Owner’s Project Manager, and design team presented an overview of the options studied during the Feasibility Study and the District’s preferred solution to proceed into Schematic Design for a project that proposes to consolidate the student population of the Charles S. Ashley Elementary School and Jireh Swift Elementary School and construct a new facility serving Kindergarten through grade 5, plus Pre-Kindergarten, on the site of the existing Charles S. Ashley Elementary School. The FAS, MSBA staff, and the District discussed the following:
- Appreciation of the thoroughness of the District’s Educational Program and inclusion of multilingual/multicultural learning opportunities at the elementary level;
- The distribution of Special Education spaces, with particular attention to the main floor, and the DESE review process during Schematic Design;
- Appreciation for the proposed layout;
- The massing and scale of the building in relationship to the residential neighborhood and as it relates to lower elementary grades;
- Design strategies and opportunities to further refine scale as the design progresses;
- Appreciation for the continuity between the adjacent park and the proposed courtyard;
- Site topography and how the fields and playgrounds will nestle into the site;
- Site access and circulation; and,
- Consideration of current supply chain conditions as it relates to the construction schedule and use of Design/Bid/Build construction delivery method.
Staff Presentations:
Staff presented on the following items at the September 16, 2026 Facilities Assessment Subcommittee meeting:
- Schematic Design Updates
- Swansea, Joseph Case Junior High School
- Annual Cap Reconciliation Update
- Model School Procurement Update