Module 4 – Schematic Design
Based upon the completed Feasibility Study and the steps outlined in Module 3 – Feasibility Study, the District and its team, in collaboration with the MSBA, develop a robust schematic design of sufficient detail to establish the scope, budget and schedule for the Proposed Project. The MSBA generates a Project Scope and Budget Agreement that documents the project scope, budget, schedule and MSBA financial participation to forward to the MSBA Board of Directors for their consideration. Approval by the MSBA Board of Directors is required for all projects in order for the MSBA to enter into a Project Scope and Budget Agreement and a Project Funding Agreement with the District. Refer to Module – 5 Funding the Project for additional information.
The following documents are available to assist the District:
- MSBA Space Summary Templates
- DESE Template Cover Letter
- Special Education Adjacency Table Template
- Total Project Budget Template
- Schematic Design Submittal Notification Template
- Local Actions and Approval Certification Template Reports
- Module 4 Completion Checklist
- Submittal Dates for Board Meetings
- Project Advisory 81
- Project Advisory 88
- State Site Permit Tracking Worksheet (refer to Project Advisory 88)
At the August 28, 2024 Board Meeting
- Two districts were recommended for Project Scope and Budget.
- Burlington, Fox Hill Elementary School
- Canton, William H. Galvin Middle School
- Based on the most recent data and schedules provided to the MSBA by districts, three districts will appear before the Board for Project Scope and Budget Agreement authorizations at the October 2024 and December 2024 Board meetings.
- Dedham, Oakdale Elementary School
- Quincy, Squantum Elementary School
- South Shore RVTSD, South Shore RTHS